Peinemann Port Services carries out a repair project on the red Figee harbor crane of the Maritime Museum.

Posted: 1 July 2019

The boom and tower at the back are repaired and preserved. In addition, the hoisting cables are all checked, inspected and, where necessary, renewed. The crane house is also  refurbished and painted. This repair job will last three weeks. After the repairs, the crane is 100% usable again.

Overview
portservices repair renovation